Project Details:

Project: Agile Claymont

Location: Claymont, DE

Duration: 2024 - Current

Project Details:

Diamond Materials is currently engaged in the Agile Claymont project, a sitework initiative for a 163,130 square-foot cold storage facility located at 400 Naamans Road, Claymont, DE. The project is valued at $5.63 million and covers 31.65 acres, with 10 acres designated for clearing.

The original project duration was set for 1.5 years, but Diamond anticipates completing it in a shorter timeframe. A significant challenge has been the extensive rock on-site, necessitating blasting for excavation. Additionally, existing concrete slabs, curbs, and underground structures required demolition; these materials were then crushed and recycled on-site as recycled concrete aggregate (RCA) for subbase.